In December 2016, Catonic (M) Sdn. Bhd. was approached by The Sanderson Design Group (Malaysia) to act as the rescue contractor for the uncompleted and abandoned Tensile Membrane Works for the Theme Park. The Tensile Membrane Roof canopies are the main features of the park and Catonic was engaged to re-evaluate the integrity of the structures as well as finish off the balance works which eventually made up being the major portion of the works.
 
Analytical analysis was carried out and it was discovered that the original design was grossly inadequate and those structures that had been installed requires total replacement or major strengthening works need to be undertaken.
The works was completed in June 2017.
PROJECT DATA

Client

Animation Theme Park Sdn. Bhd.

Architect / Engineer

The Sanderson Design Group (Malaysia) Sdn. Bhd.

Main Contractor

The Sanderson Design Group (Malaysia) Sdn. Bhd.

Specialist Contractor

Catonic (M) Sdn. Bhd.

Fabrication / Installation

Catonic (M) Sdn. Bhd.

Material

PVDF Coated PVC

Covered Area

7000m²

Location

Ipoh, Perak

Year of Completion

2017